Skipsteknisk News

Brunvoll repeat for Nexans at Ulstein

Nexans Marine Operations AS has returned to Ulstein Verft AS to build a new and updated version of the DP3 cable laying vessel MS “Nexans Aurora”. The new vessel will share the same comprehensive propulsion and manoeuvring package from Brunvoll. Brunvoll’s delivery for the new cable-laying vessel will share the same specifications as the previous delivery, consisting of three azimuth propulsion units, two tunnel thrusters, and a retractable azimuth thruster. All the thrus...

Ulstein Verft signs new shipbuilding contract on a cable laying vessel for Nexans

Nexans Marine Operations AS and Ulstein Verft entered into a contract for the construction of a large DP3 cable-laying vessel. The vessel, an ST-297 CLV design by Skipsteknisk, is an updated version of the Nexans Aurora, delivered in 2021. “We awarded the contract for a new vessel to Ulstein after an extensive tendering process, where Ulstein’s track record, including the delivery of Nexans Aurora, was important factors in deciding on the shipyard Ulstein Verft yet ag...

PARAT installs boilers in the NB1107 arctic freezer trawler which is to be delivered to the Ocean Prawns AS

Steam will be delivered by the MCS combined steam boiler utilising the exhaust heat and is equipped with an MDO atomising burner. PARAT will also deliver an MVH oil-fired smoke tube boiler for hot water. The system will be delivered with a feed water tank, water treatment, heat exchangers, hot water boiler, pumps and surplus steam dumping system. All are controlled by a PARAT-designed PLC system. The Steam System will be used for the trawlers processing plants, the MVH hot water boiler will be...

PARAT combined steam boiler to be installed in the NB326 stern freezer trawler

Steam will be delivered by PARAT’s MCS combined steam boiler utilising the exhaust heat and is equipped with an MDO atomizing burner. PARAT will also deliver 2 electrical heaters (250 and 400kW) for Hot Water. Central heating system The system will be delivered with a feed water tank, water treatment, heat exchangers, electrical heaters, pumps and surplus steam dumping system. All are controlled by a PARAT-designed PLC system. The steam system will be used for the trawlers processing pla...

vfd