Eneco News

Rotterdam Shore Power partnership drives sustainability

APM Terminals Maasvlakte II (APMT MVII) will equip its terminal with shore power from 2028. This is a significant step in making the port of Rotterdam sustainable. For this purpose, the company has signed an agreement with Rotterdam Shore Power comprising a partnership between the Port of Rotterdam Authority and Eneco. This means that from 2028, sea-going vessels will be supplied with clean energy while staying in the port. Agreement with Rotterdam Shore Years of trial and coalition preceded...

Planned 800-MW Eneco Electrolyser brings the target of 2.5 GW hydrogen production in 2030 closer

Eneco has applied for the permit to construct the ‘Eneco Electrolyser’. This 800-MW green hydrogen plant will bring the target of 2.5 GW production of green hydrogen in 2030 in Rotterdam a massive step closer. Eneco Electrolyser The Eneco Electrolyser will use green energy from solar and wind farms to produce the hydrogen. With this hydrogen, which therefore uses no fossil fuel, the industry can make processes and products more sustainable. Currently, the largest European hydrogen...

Boskalis puts 2 GWh shore-based power facility into service in Rotterdam, Netherlands

Boskalis put into service a large-scale shore-based power facility at its Waalhaven location in Rotterdam, Netherlands. This service centre is equipped with berths where Boskalis handles the mobilisation and demobilisation of vessels for a variety of its own projects. Going forward, moored vessels will cease to use diesel-powered generators and transition to green shore-based power. Additionally, Boskalis will utilise Rotterdam Shore Power’s shore-based power installation to power a range...

Belgian pioneers in offshore renewable energy join forces for second North Sea Summit in Ostend

The second North Sea Summit which is being organised by the Belgian Federal Government will have an important industrial outlook since it will be supported by seven Belgian companies and federations. These are the system operators Fluxys and Elia, the hydraulic engineering specialists DEME and Jan De Nul, the Belgian Offshore Platform, the Belgian employers' association for technology companies Agoria, and the Port Oostende. North Sea Summit  They will be welcoming the CEOs of 100 to...

Port of Rotterdam Authority and Eneco to build green shore electric facility for Boskalis ships in Waalhaven

The Port of Rotterdam Authority and Eneco are going to install shore-based power facilities in the Waalhaven, so that Boskalis work boats moored there can run on green power instead of fossil fuels. A shore-based power installation will be built on the Boskalis site in the Waalhaven, Rotterdam. There are two berths on the quay at this location which are in frequent use. Vessels come to the Waalhaven service centre for maintenance and to be prepared for offshore projects. Reaching climate neutr...

vfd