Download PDF version

These quality boilers will be installed in the NB1105 Arctic Freezer Trawler and delivered to the owner PF Havborg from the Faroe Islands in 2022.

Steam will be delivered by the MCS Combined Steam Boiler utilising the exhaust heat and is equipped with an MDO atomising burner. PARAT will also deliver an MVH Oil-Fired Smoke Tube Boiler for Hot Water.

Equipment delivery

The system will be delivered with a Feed water tank, water treatment, heat exchangers, hot water boiler, pumps, and surplus steam dumping system. All are controlled by a PARAT-designed PLC system. The Steam System will be used for the trawlers processing plants, the MVH Hot Water Boiler will be used by the central heating system.

The Arctic Freezer Trawler is a Skipsteknisk ST-119 design, being built at Tersan Shipyard in Turkey, and will be delivered to the owner PF Havborg from the Faroe Islands in 2022.

Download PDF version Download PDF version
  • Related companies
  • Parat
  • View all news from
  • Parat

In case you missed it

Offshore wind growth: ABS and Akselos partnership
Offshore wind growth: ABS and Akselos partnership

ABS and Akselos have signed a Memorandum of Understanding (MoU) to advance engineering and certification processes for floating offshore wind projects. The companies sig...

NAPA solutions simplify and streamline onboard and shoreline operations
NAPA solutions simplify and streamline onboard and shoreline operations

Trusted by more than 3,000 ships worldwide, NAPA’s Safety Solution software has promoted ship safety and operational efficiency for 35 years, working closely with customers....

World Shipping Council welcomes new leadership team
World Shipping Council welcomes new leadership team

The World Shipping Council (WSC) Board of Directors has elected Soren Toft, CEO of MSC Mediterranean Shipping Company, as the new Chair of the World Shipping C...

vfd